Government

  • Veterans Affairs

    Multiple Locations

    13 MW

    In July 2009, the Department of Veteran Affairs (VA) released RFQ’s for turnkey solar PV systems at 19 VA Medical Center sites totaling in nearly 13 MWs of renewable energy generation. REC Solar...

    View the case study >

  • VA Southern Arizona

    Tucson, AZ

    3.2 MW

    The Department of Veterans Affairs competitively awarded REC Solar two separate contracts to furnish turnkey solar electric systems to the Southern Arizona VA Health Care System. The first...

    View the case study >

  • Madera Wastewater Treatment Plant

    Madera, CA

    1.16 MW

    REC Solar was awarded the engineering, procurement and construction of the solar array at the Wastewater Treatment Facility. The system utilizes dual axis tracking to optimize power output. Power...

    View the case study >

  • USDA Forest Service

    San Dimas, CA

    302 kW

    REC Solar was competitively awarded a turnkey solar installation contract at the San Dimas Technology and Development Center (SDTDC) to design and install a fixed-axis ground mounted PV system. ...

    View the case study >

  • City of Santa Cruz Waste Water Treatment Facility

    Santa Cruz, CA

    50.4 kW

    REC Solar installed this system in conjunction with an upgrade to the facility’s biogas/natural gas electric cogeneration system. The combined facilities produce 100% of the waste water...

    View the case study >

  • South Gate City Hall

    South Gate, CA

    44.5 kW

    This solar electric system was installed as part of an overall energy-efficiency overhaul undertaken by the city. REC Solar was subcontracted by Chevron/Texaco, the company conducting the...

    View the case study >